New Page 1

                                              

Faisalabad Electric Supply Company

Home Up

 

Tarrif

Trainers, Skill Developers, Business Consultants, Researchers & E-Experts

Home
Up

 

Tariff:

  SCHEDULE OF ELECTRICITY TARIFFS
TARIFF CATEGORY/PARTICULARS FIXED CHARGES Rs/KWM ENERGY CHARGES Ps/KWH F.A.S Ps/KWH ADDITIONAL SURCHARGE Ps/KWH
GENERAL SUPPLY TARIFF A-1

UP TO 50 UNITS

54 7 73
FOR CONSUMPTION ABOVE 50 UNITS
FOR FIRST 100 UNITS (1-100) 68 7 89
FOR NEXT 200 UNITS (101-300) 77 15 160
FOR NEXT 700 UNITS (300-1000) 110 75 286
FOR NEXT 3000 UNITS (1001-4000) 147 75 385
ABOVE 4000 UNITS 147 75 436
Under this tariff, there shall be minimum monthly charges at the following rates even if no energy is consumed.
a) Single Phase connections Rs.45/-
b) Three Phase connections Rs. 100/-plus Rs.25/- per KW for load in excess of 5 KW
FLAT RATE FOR FATA 90(Rs/Con/M) 537(Rs/Con/M)
GENERAL SUPPLY TARIFF A-2
FOR FIRST 100 UNITS 217 75 346
ABOVE 100 UNITS 241 75 356
Under this tariff, there shall be minimum monthly charges at the following rates even if no energy is consumed.
a) Single Phase connections Rs. 150/-
b) Three Phase connections Rs.300/-plus Rs.30/- per KW for load in excess of 10 KW
INDUSTRIAL SUPPLY TARIFFS
B-1 UP TO 40 KW (at 400 volts) 119 75 246
There shall be a minimum monthly charges of Rs.70/KW for first 20 kilowatt of load and Rs.90/KW for loads between 20-40 KW even if no energy is consumed.
B-2 from 41-500 KW (at 400 volts) 200 68 75 220
B-3 up to 5000 KW (at 11-33 KV) 290 67 75 144
B-4 For all loads (at 66-132-220 KV) 280 62 75 133
Special Tariff for High Voltage & Short Circuit Testing Lab. Rawat 126 75 144
Note: B2 consumers can opt for T.O.D Tariff .

B3 and B4 Tariff is valid up to 30-09-1999 by which date all

B3 and B4 connections will be converted to T.O.D Tariff.

INDUSTRIAL SUPPLY TIME OF DAY TARIFFS

PARTICULARS

FIXED CHARGES ENERGY CHARGES F.A.S

 

 

(Ps/Kwh)

ADD: SURCHARGE
RS/KW/Month Off peak hours (Ps/KWH) Peak Hours (ps/Kwh) Off peak hours (Ps/KWH) Peak Hours (ps/Kwh)
B-2 TOD(from 41 KW to 500 KW 200 58 136 75 205 276
B3 TOD for sanctioned load not exceeding 290 53 135 75 103 169
5000 KW (at 66-132-220 KV) 280 49 125 75 96 167
Note: In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "SUPPLY Charges" is also leviable "SUPPLY CHARGES" include Fixed Charges, Energy Charges, F.A.S and low Power Factor Penalty.
TARIFF CATEGORY/ PARTICULARS FIXED CHARGES RS/KWM ENERGY CHARGES PS/KWH F.A.S

Ps/KWH

ADDITIONAL SURCHARGE

Ps/KWH

BULK SUPPLY TARIFFS
C-1 (a) 400 Volts   83 75 262
C-1 (b) 400 Volts 220 68 75 251
C-2 (a) 11-33KV   69 75 238
For Govt. of AJ & K   69 75 165
C-2 (b) POF-Wah   95 75 274
C-2 (c) 11-33 KV 216 65 75 248
C-3 66-132-220 KV 214 63 75 224
AGRICULTURE TARIFF-D
  1. SCRAP
  85 75 213
  • (I) PUNFAB AND SINDH
82 49 75 63
  • (II) NWFP & BALUCHISTAN
72 34 75 145
FLAT RATE TARIFF D-1 FIXED CHARGES RS/HP/MONTH ADDITIONAL SURCHARGE RS/MP/MONTH
1. NWFP, PUNJAB & SINDH 147 373
2. NWFP & BALUCHISTAN and Distt of Mianwali and Bahawalpur in Punjab & Tharparkar in Sindh. 122 316
Note: All Flat Rate Agriculture Tariff D-1 to be converted to Tariff-D by 30-06-99.
   
TARIFF CATEGORY/ PARTICULARS FIXED CHARGES RS/KWM ENERGY CHARGES PS/KWH F.A.S

Ps/KWH

ADDITIONAL SURCHARGE

Ps/KWH

TEMPORARY SUPPLY TARIFFS

E-I (ii) Domestic Supply

E-1 (ii) Commercial Supply

170

 

319

75

 

75

299

 

446

For the above two categories, the minimum bill of the consumers

shall be Rs.46/- per day subject to a minimum of Rs. 200/- for

the entire period of supply, even if no energy is consumed.

E-2 (I) Industrial Supply 174 75 303
E-2 (ii)(a) Bulk supply to Licensees/non-licensees (at 400 Volts) 135 75 315
E-2 (ii)(b) Bulk supply to Licensees/non-licensees (at 11KV)

 

 

123 75 303
E-2 (iii) Bulk supply to other consumers. 144 75 323

 

SEASONAL INDUSTRIAL SUPPLY TARIFF-F SUPPLY CHARGES ADD:SURCHARGE

125% of the supply charges 125% of the add: surch.

Relevant industrial supply of the relevant industrial

Tariff. Supply Tariff.

Note: Tariff – F consumers will have the option to concert

To Regular Tariff and vice versa. This option can be exercised

At the time of a new connection or at the beginning of the season.

Once exercised, the option will remain in force for at least one

Year. In all electricity tariff. "SURCHARGE" at the rate of

10.4% of supply charges is also levi able. "Supply Charges"

include fixed charges, F.A.S & Low Power factor penalty.

 

 

   
TARIFF CATEGORY/ PARTICULARS FIXED CHARGES RS/KWM ENERGY CHARGES PS/KWH F.A.S

Ps/KWH

ADDITIONAL SURCHARGE

Ps/KWH

RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES (TARIFF-H)        
1. Consumers having their own transformer.   104 75 302
2. Consumers not having their own transformer   105 75 304
TARIFF FOR RAILWAY TRACTION   61 75 250
TARIFF-J FOR CO-GENERATION CONSUMERS
1. SALE OF POWER BY WAPDA   133 75 270
2. PURCHASE OF POWER BY WAPDA        
a) During December to July   103 __ __
b) During August to November   78 __ __
PUBLIC LIGHTING TARIFF-G
1. UNIT CHARGES        

 

TARIFF CATEGORY/ PARTICULARS FIXED CHARGES RS/KWM ENERGY CHARGES PS/KWH F.A.S

Ps/KWH

ADDITIONAL SURCHARGE

Ps/KWH

  1. For Provincial Governments affording exemption to                   As per General Supply Tariff A-1

    Payment of octroi & property tax.

  2. For consumers other than those falling in the category                           152                 75                  449

Tariff G-1

  1. FIXED LINE CHARGES PER MONTH PER MILE
  1. Where the entire capital cost in laying street lighting supply              Rs. 253/-

    Line which is exclusively meant for Street-Lighting is borne

    by the Authority.

  2. Where the entire capital cost in laying Street-Lighting                        Rs. 23/-

    Supply

    Line which is exclusively meant for street lighting is borne by

    The consumers.

  3. Where the entire capital cost in laying street lighting supply               Rs.158/-

    Line over the existing distribution system is borne by the

    Authority.

  4. Where the entire capital cost in laying street lighting supply line         Rs. 33/-

over the existing distribution system is borne by the consumer.

(V) For street lighting supply through underground cables.                        Rates to be negotiated.

Note: In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of

"Supply Charges" is also livable. "Supply Charges" include Fixed Charges,

Energy Charges, F.A.S and low Power Factor Penalty.

   

 

 

Home ] Up ]

This website is designed, hosted and published by:

Send your suggestions and comments on this website:
Copyright © 2000 FESCO
Last modified: August 23, 2000